Tamamlanan Projeler
ATAMURAT 500/220/110/35/10kV SWITCHYARD
MARY 500kV Switchyard
MARY FERTILIZER PLANT 220/6.3kV
BUGDAYLY SUBSTATIONS 110/10kV
GÜLBAHAR SUBSTATION 220/110/20 kV
ATAMURAT 500/220/110/35/10kV SWITCHYARD
MARY 500kV Switchyard
MARY FERTILIZER PLANT 220/6.3kV
BUGDAYLY SUBSTATIONS 110/10kV
GÜLBAHAR SUBSTATION 220/110/20 kV
Referanslarımız
Endüstriyel Tesis Elektrifikasyon Projeleri
Yüksek Gerilim Projeleri
Endüstriyel Tesis Elektrifikasyon Projeleri
1 | KAPTAN STEEL FACTORY | 380/35KV Air Installed Type Switchyard and Substation, Civil and Electrical Design, Engineering, Supply, Erection and Test & Commissioning, 2 Each PCS 380KV Line Feeder, 1 Each PCS 380KV Coupling Feeder, 2 Each PCS 380/33KV Transformer Feeder | Tekirdag/TURKEY | 2001 |
2 | NUROL CONSTRUCTION A.Ş. BUSINESS CENTRE | 36KV and 0.4KV Transformer Substation Modernisation | Istanbul/TURKEY | 1999 |
3 | APS-2 PACKING FACTORY CHEMISTRY | Turn-Key Electrical Contracting | Istanbul/TURKEY | 1999 |
5 | ÇALIK HOLDING ASHGABAT TEXTILE FACTORY | Turn-Key 110/10KV, 2x16MVA, Transformer Substation Electrical Contracting Including Engineering, Test & Commissioning Services, Civil Works and Supply & Installation Works | Ashgabat/TURKMENISTAN | 1999 |
6 | TEKNİK MENSUCAT, YARN FACTORY | Textile Turn-Key Electrical Contracting | Kasansay/ÖZBEKISTAN | 1999 |
7 | ÇIRAKLAR TEXTILE FACTORY | Textile “Solidyne” HVAC Control System | Isparta/TURKEY | 1999 |
8 | İSDEMİR IRON and STEEL WORK | Iron-Steel Medium Section Profile Mill 3900kw Duo Mill DC Drive and Automation System | Iskenderun/TURKEY | 1999 |
9 | ÇALIK ENERJİ, ABADAN (BUZMEYIN) POWER PLANT | Design & Engineering of All Electrical Works of Power Plant, Design & Engineering of 110KV Air Installed Type Switchyard Including All Civil and Electrical & Dcs System Erection, Test & Commissioning of All Electrical Works Including Power Plant & Switchyard Supply of All Protection System Including 220KV & 110KV Switchyard | Abadan/TURKMENISTAN | 2003 |
10 | ÇALIK ENERJİ, BALKANABAT POWER PLANT | Design & Engineering of All Electrical Works of Power Plant, Design & Engineering of 220KV & 110KV Air Installed Type Switchyard Including All Civil and Electrical & DCS Systemerection, Test & Commissioning of All Electrical Works Including Power Plant & Switchyard Supply of All Protection System Including 220KV & 110KV Switchyard | Balkanabat/TURKMENISTAN | 2003 |
11 | NORSEL YARN FACTORY | Textile Turn-Key Electrical Contracting of 110/10KV 2x10MVA, Transformer Station, Including Civil Works, Engineering and Supply Services | Baharden/TURKMENISTAN | 2003 |
12 | NORSEL YARN FACTORY | Textile Turn-Key Electrical Installation of 110KV, Transformer Substation, 1- Feeder, Including Civil Works and Engineering Services | Kergi/TURKMENISTAN | 2002 |
13 | NORSEL YARN FACTORY | Textile Turn-Key Electrical Contracting For 10KV, Transformer Station and Total Factory Electrification | Kergi/TURKMENISTAN | 2002 |
14 | İÇDAŞ IRON and STEEL IND. | Electrical Installation of 380KV Transformer Substation For Natural Gas Combined Cycle Power Plant, 1-Feeder Including Engineering Services, All Buildings and Civil Works | Bursa/TURKEY | 2002 |
15 | ÇALIK ENERJİ, DASOGUS (DPS) POWER PLANT | Design & Engineering of All Electrical Works of Power Plant, Design & Engineering of 110KV Air Instaled Type Switchyard Including All Civil and Electrical & DCS System Erection, Test & Commissioning of All Electrical Works Including Power Plant & Switchyard Supply of All Protection System Including 110KV Switchyard | Dasogus/TURKMENISTAN | 2007 |
16 | ÇALIK ENERJİ, ASHGABAT (APS) POWER PLANT | Design & Engineering of All Electrical Works of Power Plant, Design & Engineering of 110KV Air Type Switchyard Including All Civil and Electrical & DCS System Erection, Test & Commissioning of All Electrical Works Including Power Plant & Switchyard Supply of All Protection System Including 110KV Switchyard | Ashgabat/TURKMENISTAN | 2006 |
17 | TURKMENKALE MACARONI FACTORY | Turn-Key Electrical Installation of 35/11KV 2×6,3MVA Transformer Station, 1- Feeder, Including Civil Works and Engineering Services | Turkmenkale/TURKMENISTAN | 2006 |
18 | ÇALIK ENERJİ, 220KV & 110KV 6PCS SUBSTATION AMUDERYA PROJECT | Design & Engineering of All Electrical Works of 220KV & 110KV Air Type Switchyard Including All Civil and Electrical Works Supply of the Equipments Excluding Power Transformers For All 220KV & 110KV Switchyards, Test & Commissioning of All Electrical Works Including All Switchyards |
Amuderya/TURKMENISTAN | 2006 |
19 | FOLKESTONE ASHGABAT YARN FACTORY | Textile Turn-Key 110/35KV, 2x16MVA, Transformer Substation Electrical Contracting Including Engineering, Test & Commissioning Services, Civil Works and Supply & Installation Works | Ashgabat/TURKMENISTAN | 2005 |
20 | DASOGUZ YARN FACTORY | Textile Turn-Key 110/10KV, 2X6,3MVA Transformer Substation Electrical Contracting Including Engineering, Test & Commissioning Services, Civil Works and Supply & Installation Works | Dasoguz/TURKMENISTAN | 2009 |
21 | LOTUS ENERJİ POWER PLANTS | (220KV & 110KV, 2×127,1 MW AHAL POWER PLANT & AWAZA POWER PLANT) Project, Design & Engineering of All Electrical Works of 220KV & 110KV Air Type Switchyard Including All Civil and Electrical Works Supply of the Equipments Excluding Power Transformers For All 220KV & 110KV Switchyards, Test & Commissioning of All Electrical Works Including All Switchyards | Awaza & Ahal/TURKMENISTAN | 2008 |
22 | MICRORAYONNAYA | Turn-Key 110/35KV, 2X16MVA, Transformer Substation Electrical Contracting Including Engineering, Test & Commissioning Services, Civil Works and Supply & Installation Works | Balkanabat/TURKMENISTAN | 2008 |
23 | DEMİRSAN MOROCCO METALLURGY FACTORY | Turn-Key 220/35KV, 1x125MVA+1x63MAV Transformer Substation Electrical Contracting Including Engineering, Test & Commissioning Services and Supply & Installation of All Works | MOROCCO | 2007 |
24 | ERENCO HOLDING TURKMENISTAN METALLURGY FACTORY | Turn-Key 220/35KV, 2x63MVA, Transformer Substation Electrical Contracting Including Engineering, Test & Commissioning Services and Supply & Installation of Works | Ashgabat/TURKMENISTAN | 2007 |
25 | FOLKESTONE ABADAN YARN FACTORY | Textile Turn-Key 110/35KV, 2x16MVA, Transformer Substation Electrical Contracting Including Engineering, Test & Commissioning Services, Civil Works and Supply & Installation Works | Abadan/TURKMENISTAN | 2007 |
Yüksek Gerilim Projeleri
1 | ÇALIK HOLDİNG | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | ASHGABAT TEXTILE FACTORY- 110/10kV AIS with 2X16MVA TRANSFORMERS Design & Engineering, Supply, Installation, Test & Commissioning | TURKMENISTAN (ASHGABAT) | 1999 |
2 | KAPTAN DEMIR CELIK ENDUSTRI TIC.AS | KAPTAN DEMIR CELIK ENDUSTRI TIC.AS | KAPTAN STEEL FACTORY- 380/35kV AIS with 1X100MVA TRANSFORMER Design & Engineering, Supply, Installation, Test & Commissioning | TURKEY (CORLU) | 2001 – 2002 |
3 | SIEMENS | ICDAS DEMIR CELIK | ICDAS IRON AND STEEL IND.- 380/35kV AIS SWITCHYARD Electrical installation works including engineering services | TURKEY (BIGA) | 2001 – 2002 |
4 | SIEMENS | ICDAS DEMIR CELIK | BURSA NATURAL GAS POWER PLANT 380KV AIS , 380KV FEEDER EXTENSION ; Design, Engiineering , Civil works, Installation, Partial supply, Test & Commissioning | TURKEY (BURSA) | 2001 – 2002 |
5 | NORSEL HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | KERGI YARN FACTORY 110/10kV AIS with 2X10MVA Transformers, Design & Engineering, Civil works, Supply, Installation, Test & Commissioning | TURKMENISTAN (KERGI) | 2002 |
6 | NORSEL HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | BAHARDEN YARN FACTORY 110/10kV AIS with 2X10MVA Transformers, Design & Engineering, Civil works, Supply, Installation, Test & Commissioning | TURKMENISTAN (BAHARDEN) | 2003 |
7 | CALIK HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | BALKANABAT POWER PLANT Design & engineering of all electrical works of Power plant and Design & Engineering of 220kV & 110kV AIS including all civil and electrical works, supply of Protection & Control system, Supervision of Installation , Test & Commissioning of all electrical works, Telecomminication & SCADA system | TUTKMENISTAN (BALKANABAT) | 2003 |
8 | CALIK HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | ABADAN POWER PLANT Design & engineering of all electrical works of Power plant and Design & Engineering of 110kV AIS including all civil and electrical works, supply of Protection & Control system, Supervision of Installation , Test & Commissioning of all electrical works, Telecomminication & SCADA system | TURKMENISTAN (ABADAN) | 2003 |
9 | FOLKESTONE HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | FOLKESTONE ASHGABAT YARN FACTORY Turn-key 110/35kV, 2X16MVA Transformer substation electrical contacting including engineering , Test & Commissioning, civil works and supply & installation works | TURKMENISTAN (ASHGABAT) | 2005 – 2006 |
10 | ÇALIK HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | KOPETDAG SUBSTATION 220kV Substation Protection and Control Systems Design Supply and Installation supervision | TURKMENISTAN (ASHGABAT) | 2006 |
11 | CALIK HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | AMUDERYA PROJECT ( 2 pcs 220/110kV and 4 pcs 110kV AIS) Design & Engineering of all civil & electrical works, Partial Supply of equipments, Supervision of installation, Test & Commissioning | TURKMENISTAN (AMUDERYA) | 2005 – 2006 |
12 | BOZDEMIR INSAAT LTD. STI. | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | TURKMENKALE MACARONI FACTORY Turn-key Electrical Installation of 35/11kV 2X6,3MVA Transformer Station, 1- feeder, including civil works and engineering services | TURKMENISTAN (TURKMENKALE) | 2005 – 2007 |
13 | CALIK HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | ASHGABAT (APS) POWER PLANT Design & engineering of all electrical works of Power plant and Design&Engineering of 110kV AIS including all civil and electrical works, supply of Protection & Control system, Supervision of Installation , Test & Commissioning of all electrical works, Telecomminication & SCADA system | TURKMENISTAN (ASHGABAT) | 2005 – 2006 |
14 | AREVA T&D ENERJI ENDUSTRI A.S. | BARKI TOJIK | 220/110kV JANGAL AIS SUBSTATION Design & engineering , Supply, Test & Commissioning of Protection & Control System | TAJIKISTAN (JANGAL) | 2005 – 2006 |
15 | CALIK HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | DASOGUS POWER PLANT Design & engineering of all electrical works of Power plant and Design&Engineering of 110kV AIS including all civil and electrical works, supply of Protection & Control system, Supervision of Installation , Test & Commissioning of all electrical works | TURKMENISTAN (DASOGUZ) | 2003 – 2007 |
16 | FOLKESTONE HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | ABADAN YARN FACTORY Turn-key 110/35kV, 2X16MVA Transformer substation electrical contacting including engineering , Test & Commissioning, civil works and supply & installation works | TURKMENISTAN (ASHGABAT) | 2006 – 2007 |
17 | ERENCO HOLDING | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | TURKMENISTAN METALLURGY FACTORY Turn-key 220/35kV, 2X63MVA Transformer substation electrical contacting including engineering , Test & Commissioning and supply & installation of all works | TURKMENISTAN (ASHGABAT) | 2006 – 2007 |
18 | DEMIRSAN HADDECILIK SAN. TIC. A.S. | ONE MOROCCO (Office National de l’Electricité) | MOROCCO METALLURJI FACTORY Turn-key 220/35kV, 1X125MVA+1X63MVA Transformer substation electrical contacting including engineering, civil works , Installation , Test & Commissioning | MOROCCO | 2007 – 2009 |
19 | ECOMAT OIL& GAS ENGINEERING COMPANY | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MICRORAYONNAYA SUBSTATION Turn-key 110/35kV, 2X16MVA Transformer substation electrical contacting including engineering , Test & Commissioning, civil works and supply & installation works | TUTKMENISTAN (BALKANABAT) | 2007 – 2008 |
20 | LOTUS ENERGY | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | AHAL POWER PLANT Design & engineering of all electrical works of Power plant and Design&Engineering of 220kV & 110kV AIS including all civil and electrical works, supply of equipments excluding power transformers, Supervision of Installation , Test & Commissioning of all electrical works | TURKMENISTAN (AHAL) | 2008 – 2009 |
21 | LOTUS ENERGY | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | AWAZA POWER PLANT Design & engineering of all electrical works of Power plant and Design&Engineering of 220kV & 110kV AIS including all civil and electrical works, supply of equipments excluding power transformers, Supervision of Installation , Test & Commissioning of all electrical works, Telecomminication & SCADA | TURKMENISTAN (AWAZA) | 2008 – 2010 |
22 | COTAM ENTERPRISES LTD | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | DASOGUZ YARN FACTORY Turn-key 110/10kV, 2×6,3MVA transformer substation electrical contracting including engineering, Test & Commissioning, civil works and supply & installation works | TURKMENISTAN (DASOGUZ) | 2009 |
23 | ENGIN GROUP CONSCORCIUM | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | TURKMENABAT YARN FACTORY Turn-key 110/10kV, 2×6,3MVA transformer substation electrical contracting including engineering, Test & Commissioning, civil works and supply & installation works | TURKMENISTAN (TURKMENABAT) | 2007 – 2009 |
24 | COTAM ENTERPRISES LTD | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | GOKTEPE YARN FACTORY Turn-key 110/10kV, 2×6,3MVA transformer substation electrical contracting including engineering, Test & Commissioning, civil works and supply & installation works | TURKMENISTAN (GOKTEPE) | 2009 – 2010 |
25 | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | YOLOTEN GAS FIELD – YOLOTEN 220/110/35kV AIS with 2X40MVA TRANSFORMERS ; Design&Engineering of civil & electrical works , Supply of Materials , Supervision of istallation, Test & Commissioning | TURKMENISTAN (YOLOTEN) | 2008 – 2010 |
26 | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | SOUTH YOLOTEN GAS FIELD – ENERGETIC 110/35/10kV AIS with 2X10MVA TRANSFORMERS ; Design&Engineering of civil & electrical works , Supply of Materials , Supervision of istallation, Telecomminication , Test & Commissioning | TURKMENISTAN (YOLOTEN) | 2008 – 2009 |
27 | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | YOLOTEN GAS FIELD – GOLOVNEYA 110/10kV AIS with 2X25MVA TRANSFORMERS Design&Engineering of civil & electrical works , Supply of Materials , Supervision of istallation , Telecomminication, Test & Commissioning | TURKMENISTAN (YOLOTEN) | 2008 – 2009 |
28 | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | YOLOTEN GAS FIELD – GURRUKBIL 110/10kV AIS with 2X10MVA TRANSFORMERS Design&Engineering of civil & electrical works , Supply of Materials , Supervision of installation, telecommunication, Test & Commissioning | TURKMENISTAN (YOLOTEN) | 2008 – 2009 |
29 | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MARY POWER PLANT 220kV AIS LINE FEEDER EXTENSION Design&Engineering of civil & electrical works , Supply of Materials , Supervision of istallation, Test & Commissioning | TURKMENISTAN (MARY) | 2008 – 2010 |
30 | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | TAGHTABAZAR 110kV AIS LINE FEEDER EXTENSION Design&Engineering of civil & electrical works , Supply of Materials , Supervision of installation, Test & Commissioning | TURKMENISTAN (TAHTABAZAR) | 2008 – 2010 |
31 | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | YOLOTEN GAS FIELD – 5 pcs 35/10kV AIS with 2X2500kVA TRANSFORMERS ; Design&Engineering of civil ,electrical , SCADA & Telecommunication works , Supply of Complete Materials , Supervision of Installation , Test & Commissioning | TURKMENISTAN (YOLOTEN) | 2008 – 2010 |
32 | PETROFAC INTERNATIONAL (UAE) LLC | TURKMENGAS STATE CONCERN | SOUTH YOLOTEN GAS FIELD DEVELOPMENT – 220kV OUTDOOR SWITHCYARD Design&Engineering of civil & electrical works , Supply of Materials , civil construction and installation works, telecommunication ,Test & Commissioning | TURKMENISTAN (YOLOTEN) | 2011 – 2012 |
33 | BTE ENERJİ San. Ve Tic. A.Ş. | TURKISH ELECTRICITY TRANSMISSION COMPANY (TEIAS) | NEW NATURAL GAS COMBINED CYCLE PLANT TO CONNECTION TO MAIN TRANSMISSION SYSTEM Design & Engineering of civil & Electrical works, supply of materials, supervision of installation, Test & Commissioning | TURKEY (KOCAELI) | 2011 – 2012 |
34 | H.J.WELİUSSAT Annalyev GURBANMUHAMMET | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | 3 NO’S 110/35/10kV TRANSFORMER SUBSTATION Design & Engineering of Electrical works, supply of materials, installation supervision ABADAN 1 / ABADAN 2 / SAKARCHAGE | TURKMENISTAN (ASHGABAT) | 2012 – 2014 |
35 | SIBA Societe Industrielle de Bois et d’Acier | SIBA Societe Industrielle de Bois et d’Acier | ELECTRICAL CONSTRUCTION OF 90/30kV SUBSTATION IN DAKAR / SENEGAL (20 MVA POWER) Design&Engineering of civil & electrical works , Supply of Materials , Supervision of Installation, Test & Commissioning | SENEGAL (DAKAR) | 2012 – 2013 |
36 | RÖNESANS TÜRKMEN İNŞAAT SAN. Ve TİC. A.Ş. | MINISTRY OF TURKMENHIMIYA OF TURKMENISTAN | MARY FERTILIZER PLANT 220/6.3kV SUBSTATION AND 12KM TRANSMISSION LINE Design & Engineering of civil & Electrical works, supply of materials, supervision of installation, Test & Commissioning | TURKMENISTAN (MARY) | 2012 – 2013 |
37 | NORSEL INTERNATIONAL İNŞAAT DIŞ TİCARET VE SAN. LTD. ŞTİ. | MINISTRY OF TEXTILE OF TURKMENISTAN | SEYDI & KÖHNE & ITNIT TEXTILE FACTORIES 2 sets 110/10kV AIS with 2X4MVA Transformers, Design & Engineering, Supply, Installation, Test & Commissioning, 3 sets of Factory Electrification Turn Key Supply & Installation | TURKMENISTAN (BALKANABAT & TURKMENABAT) | 2013 |
38 | H.J.WELİUSSAT Annalyev GURBANMUHAMMET | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | 110/35/10kV TRANSFORMER SUBSTATION 2 FEEDER EXTENSION AND TELECOMMUNICATION ADDITION Design & Engineering of Electrical works, supply of materials, installation supervision ABADAN 1 / ABADAN 2 / SAKARCHAGE | TURKMENISTAN (ASHGABAT) | 2013 – 2014 |
39 | NET YAPI VE TIC. MÜH. MİM. MÜŞ. LTD. ŞTİ. | TURKMENISTAN MINISTRY OF RAILWAY | KAZAKISTAN – TURKMENISTAN RAILWAY PROJECT -ELECTRIFICATION PACKAGE 110/35/10kV GIZILKAYA SUBSTATION 110/10kV BUZHUN SUBSTATION 110/10kV GARNIYARIK SUBSTATION Design&Engineering of civil & electrical works , Supply of Materials , Supervision of istallation, Test & Commissioning | TURKMENISTAN (BALKAN) | 2012 – 2014 |
40 | LOTUS F.Z.E. | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | TURNKEY CONSTRUCTION OF 500 kV MARY SWITCHYARD AND RECONSTRUCTION AND EXTENSION OF EXISTING 245/110kV SUBSTATIONS IN LEBAB REGION Turnkey construction of 4 substations including design & engineering of civil and electrical works, supply of materials, installation of materials,Test & Commissioning | TURKMENISTAN (MARY – LEBAB) | 2012 – 2013 |
41 | LOTUS F.Z.E. | MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN | TURNKEY CONSTRUCTION OF COMPLETE 500/220/110/35/10 kV ATAMURAT Substation in LEBAB REGION Turnkey construction of ATAMURAT Substation including design & engineering of civil and electrical works, supply of materials, installation of materials , Test & Commissioning | TURKMENISTAN (LEBAB) | 2012 – 2014 |
42 | NET YAPI VE TIC. MÜH. MİM. MÜŞ. LTD. ŞTİ. | TURKMENISTAN MINISTRY OF RAILWAY | RAILWAY PROJECT – ELECTRIFICATION PACKAGE 110/10kV BUGDAYLY AIS SUBSTATIONS 110/10kV, 2×2,5MVA BABAGULY AIS SUBSTATION Design & Engineering of civil & electrical works, Supply of Materials, Installation, Test & Commissioning | TURKMENISTAN (BALKAN) | 2014 |
43 | HYUNDAI ENGINEERING & CONSTRUCTION Co. Ltd. | TALIMERJAN TPP UNITARY ENTERPRISE of SJSC UZBEKENERGO | TALIMERJAN THERMAL POWER PLANT EXPANSION PROJECT 500kV & 220kV SWITCHYARDS AND TRANSMISSION LINES Design & Engineering of electrical works, Supply of Materials, Supervision of installation, Test & Commissioning | UZBEKISTAN (TALIMERJAN) | 2014 – 2015 |
44 | RÖNESANS TÜRKMEN İNŞAAT SAN. Ve TİC. A.Ş. | MINISTRY OF TURKMENHIMIYA OF TURKMENISTAN | 110/6,3 kV SULFIRIC ACID AND TSA TRANSFORMER SUBSTATION Design & Engineering of civil & electrical works , Supply of Materials , Supervision of installation, Test & Commissioning | TURKMENISTAN (TURKMENABAT) | 2015 – 2016 |
45 | STATE CORPS Limited | UNITED STATES ARMY CORPS OF ENGINEERING SOUTH DISTRICT as AGENCY of UNITED STATES GOVERMENT | NEPS II & III TRANSMISSION PROJECT, AFGHANISTAN 220/110/20 kV GULBAHAR SUBSTATION Design, Manufacturing and Supply of Equipment and Material, Installation, Testing and Commissioning of AIS Substation | AFGHANISTAN (GULBAHAR) | 2014 – 2018 |
46 | RONESANS HI/ KAWASAKI HI Ltd | TURKMENGAS SC / TURKMENENERGO SC | GAS TO GASOLINE ( GTG ) PROJECT – 245/10,5 kV SUBSTATION Design & Engineering of civil, electrical ,telecom and SCADA systems, Supply of complete Materials, Delivery to Site, Training, Turn-key Installation, Test & Commissioning of Complete Systems | TURKMENISTAN (ASHGABAT) | 2016 – 2018 |
47 | HYUNDAI ENGINEERING & CONSTRUCTION Co. Ltd. | JSC “TAKHIATASH TPP” of JSC “UZBEKENERGO” | TAKHIATASH POWER PLANT EFFICIENCY IMPROVEMENT PROJECT 220kV and 110kV SWITCHYARD EXTENSION PROJECT Design & engineering of civil, electrical, telecom and SCADA systems, supply of complete materials, FOB delivery, training, supervision of installation, Test & Commissioning | UZBEKISTAN (TAKHIATASH) | 2018 – 2020 |
48 | TURKMENHIMIYA | TURKMENENERGO SC | POLYETHYLENE AND POLYPROPYLEN PRODUCTION GAS AND CHEMICAL COMPLEX – 220/35kV , 2×63 MVA GIS SUBSTATION Design & Engineering of electrical, telecom and SCADA systems, Supply of complete Materials, Delivery to Site, Training, Turn-key Installation, Test & Commissioning of Complete Systems | TURKMENISTAN (KIYANLI) | 2019 – 2020 |
49 | SUMITOMO CORPORATION RONESANS End Tes. Ins./ MITSUBISHI HITACHI Power Systems | TURKMENENERGO SC | ZERGER 425 MW SCGT POWER PLANT – 245/110 kV SWITCHYARD AND EBoP Design & Engineering of civil, electrical, telecom and SCADA systems, Supply of complete Materials, Delivery to Site, Training, Turn-key Installation, Test & Commissioning of Complete Systems | TURKMENISTAN (TURKMENABAT) | 2018 – 2021 |