ATAMURAT 500/220/110/35/10kV SWITCHYARD

MARY 500kV Switchyard

MARY FERTILIZER PLANT 220/6.3kV

BUGDAYLY SUBSTATIONS 110/10kV

GÜLBAHAR SUBSTATION 220/110/20 kV

Endüstriyel ve Yüksek Gerilim Projeleri

Endüstriyel ve Yüksek Gerilim Projeleri

Endüstriyel Tesis Elektrifikasyon Projeleri

# Proje Adı Detaylar Yer Yıl
1 KAPTAN STEEL FACTORY 380/35KV Air Installed Type Switchyard and Substation, Civil and Electrical Design, Engineering, Supply, Erection and Test & Commissioning, 2 Each PCS 380KV Line Feeder, 1 Each PCS 380KV Coupling Feeder, 2 Each PCS 380/33KV Transformer Feeder Tekirdag/TURKEY 2001

Yüksek Gerilim Projeleri

# Firma Müşteri Proje Detayları Yer Yıl
1 ÇALIK HOLDİNG MINISTRY OF ENERGY & INDUSTRY OF TURKMENISTAN ASHGABAT TEXTILE FACTORY- 110/10kV AIS with 2X16MVA TRANSFORMERS Design & Engineering, Supply, Installation, Test & Commissioning TURKMENISTAN (ASHGABAT) 1999